Dintelhavenbrug (in de A15)

Dintelhaven · km 0.5

Loading the calculation...

No data available for this time range

Openings

  • Opening 1Fixed spanwidth 115.0 mboth directionsCharted (MHW): 12.10 m

Note

One fixed opening (115 m wide): 14.50 m + NAP. First bridge when entering the Dintelhaven (connected to the Hartelkanaal at km 16). Water level via the Suurhofbrug gauge.

Neighbouring bridges

Estimated live clearance; the clearance boards and the authority's notices lead.