IJssel · km 928.1
Loading the calculation...
No data available for this time range
Open/closed status (EuRIS): not available on the site.
Registration via VHF channel 20. The openings at .:42 are optional openings where the priority for shipping or train traffic depends on the water level; water level 5.20 meters or higher: all fac. openings are fixed, i.e. shipping has priority. Water level below 5.20 meters: if there is train traffic, the fac. opening is canceled, train has priority. The bottom under the lift section is now at approx NAP +85 cm (normally NAP+50 cm). The bottom width at NAP +85 cm is only 8.00 m wide. Only at approx NAP + 2.50 m is a width of 12.00 m available. A strong water level drop is possible when passing through this.
Estimated live clearance; the clearance boards and the authority's notices lead.