Prins Hendrikbrug Dordrecht

Loading the calculation...

No graph is available for this bridge.

Openings

  • Opening 3Movable spanwidth 13.9 mboth directionsCharted (MHW): closed 2.23 m
  • Opening 1Fixed spanwidth 19.0 mboth directionsCharted (MHW): 2.53 m
  • Opening 2Fixed spanwidth 23.0 mboth directionsCharted (MHW): 2.53 m

Open/closed status (EuRIS): not available on the site.

Note

Side water (Wantij): height from vaarweginformatie (FIS).

Estimated live clearance; the clearance boards and the authority's notices lead.