Suurhoffbrug (verkeers-/spoorbrug)

Hartelkanaal · km 18.8

Loading the calculation...

No data available for this time range

Openings

  • Opening 1Fixed spanwidth 90.0 mboth directionsCharted (MHW): 8.96 m
  • Opening 2Fixed spanwidth 24.0 mboth directionsCharted (MHW): 9.06 m

Note

Two fixed openings: opening 1 (90 m wide): 11.35 m + NAP; opening 2 (24 m wide): 11.45 m + NAP. Shipping uses opening 1 in both directions; the calculation therefore uses 11.35 m + NAP.

Neighbouring bridges

Estimated live clearance; the clearance boards and the authority's notices lead.