Gauge Pfelling — current water level and draft

Danube · km 2306

Measurementcm

Loading...

Gauge Pfelling is on the Danube at kilometre 2306, on the km 2311.5–2290 stretch. The RNW is 290 cm and the fairway depth maintained below it (TuRNW) is 200 cm; after deducting 30 cm of safety margin the official rule of thumb comes out at Pfelling -120. In practice Pfelling -130 is used here, -10 cm against the official rule. At high water a Marke of 620 cm applies here. This gauge has 2 forecast sources: the 2-day forecast from Elwis (green) and the 6-week forecast from the BAfG (blue, set the time range to 6 weeks to see it). Upstream lies Pfelling (Straubing Hafen Sand), downstream Deggendorf.

Leightering on the Danube (Straubing–Vilshofen)

Because the last 70‑km bottleneck between Straubing and Vilshofen on the Danube was never upgraded, a 250 cm loading draft is possible there on average only ~144 days per year. By contrast, the Rhine at Kaub allows this about ~300 days per year, as does the free‑flowing Austrian Danube. As a result, ships often arrive with too much draft and must transship part of the cargo in Regensburg (downstream) or Passau (upstream) onto additional vessels ("leightering") to reduce draft and pass this stretch. Afterwards, the cargo is often reloaded, or—if the destination is near Passau/Regensburg (e.g., Enns or Kelheim)—they proceed together to the discharge port.
Rules of thumb per gauge and port ›